Siya Habitats / Fire and life safety audit

Fire Audit ProThe fire safety audit app for Indian buildings

Built onNBC 2016NBCS 2026

The audit checklist for that building, derived from the code, captured on site without signal, and turned into the report from the same data.

Live
StatusLive.
Key requirements derived for a building Recording a non-compliant stair width with its clause The deficiency in the audit report with photo and corrective action
341Code-cited checkpoints
23Sections
208Distinct clauses
87Critical items
277Checkpoints for a G-2 factory
Derived, not filtered

The checklist is worked out for each building

Each check carries its own conditions. Give the app the building and it decides what applies, so an auditor never sees a question that cannot apply.

The building

Occupancy group, height band, basements, floor area, sprinklers.

The code edition

Two national editions held side by side, plus the binding Maharashtra schedule.

What applies

Only the checks whose conditions match, each with its clause and table.

On site, offline

Findings, measurements and photos captured at the point of observation.

The report

Produced from the same data, with every deficiency, clause and corrective action.

Key requirements, before the walk starts

Classification, travel distance, exit capacity, refuge areas, fire protection installations and water demand, each tagged with the clause or table it comes from.

The calculators encode real regulation

Exit widths, travel distances and sprinkler allowances follow the code's own rules, and return "not permitted" where the code does not allow a value at all. Where the two editions disagree, the difference is modelled rather than averaged away.

audit.siyahabitats.com

A finding, captured where it is seen

Mark the result, set the risk, note the location, measure against the limit, photograph it and write the corrective action, with no signal on the 14th floor.

audit.siyahabitats.com
Process and industrial safety

Factories need more than a building audit

For factory, storage and hazardous occupancies, Fire Audit Pro adds how the work inside is controlled, each check citing its clause of IS 14489:2018. Rules we do not yet hold are named and marked to verify, not guessed.

Work permitsContractorsChemicalsStorage vesselsStaticPressure plantFire teamEmergency plan
277Checkpoints for a G-2 factory
29Process safety checkpoints

Every gap found.
A NOC-worthy building.

Run your next audit on it.

Open the app, or ask us to walk your team through a building.

FAQ

Questions people ask

How often is a fire audit required in Maharashtra?

For buildings listed in section 45(1) of the Act, section 45A(1) requires an audit by a licensed Fire and Life Safety Auditor once in every two years. Separately, every building needs a Form B certificate from a Licensed Agency each January and July.

Is there a free fire safety audit checklist?

Yes. Our fire safety audit checklist at siyahabitats.com/fire-audit-checklist/ lists the most useful checkpoints in each section with the clause to cite. Fire Audit Pro derives the full checklist for each building.

What is Fire Audit Pro?

Fire Audit Pro is a web app for fire and life safety auditors. It builds the checklist for a specific building from the code, works on site without mobile signal, and produces the audit report from the same data.

How many checks does Fire Audit Pro cover?

Fire Audit Pro holds 341 code-cited checkpoints across 23 sections, drawn from 208 distinct clauses, with 87 marked critical. A Process and Industrial Safety section covers factory, storage and hazardous occupancies; a G-2 factory gets 277 checkpoints.

Does Fire Audit Pro work offline?

Yes. It is offline-first. Findings and photos are captured at the point of observation with no signal, and the report renders without a network connection.

Which codes does Fire Audit Pro use?

It holds two editions of the national code side by side and a rule pack transcribed from the binding Maharashtra schedule, with every row stamped with its gazette page. Process safety checks cite IS 14489:2018 and the applicable state and central rules, each named in the report.

How does Fire Audit Pro make a building fire NOC worthy?

It audits the building against NBC 2016, NBCS 2026 and the binding state rules, records every gap against its clause, and produces the report that tells the owner exactly what to fix, so the building is NOC-worthy before the fire NOC.