Fire audit guide

Fire safety audit checklist for India (NBC 2016, NBCS 2026 and state rules)

A fire safety audit in India checks a building against Part 4 of the National Building Code 2016 (and its successor, NBCS 2026 Part F) plus the state fire law: documents, occupancy, construction, compartmentation, exits and staircases, smoke control, lighting and signage, electrical rooms, detection, hydrants and pumps, sprinklers, high-rise provisions and housekeeping. The checklist below gives the most useful checkpoints in each section with the clause to cite. In Maharashtra, buildings listed in section 45(1) of the Fire Act need an audit by a licensed Fire and Life Safety Auditor once in every two years, and every building needs a Form B maintenance certificate each January and July.

Updated 2026-10-08 · By the Siya Habitats fire safety engineering team, Nagpur · Every rule cited to its source

How should you use this fire audit checklist?

Not every checkpoint applies to every building. What applies depends on the occupancy group, the height, the basements, the floor area and whether the building is sprinklered. Mark each item complied, not complied or not applicable, with location, measurement, photograph and corrective action.

Clause references are numbers only. NBC means National Building Code of India 2016, Part 4 Fire and Life Safety. NBCS means SP 7 : 2026 National Building Construction Standards, Part F. Where the number is the same in both editions it is given once.

This page lists 100 of the most useful checkpoints. Fire Audit Pro holds 341 code-cited checkpoints in 23 sections and shows each building only the ones whose conditions it meets; a G-2 factory gets 277.

Documentation and records

CheckpointWhat the auditor looks forClause
Fire NOC and occupancy certificateValid, kept on site, matching the present useNBC 3.1.14; NBCS 3.1.14
Previous fire audit reportAvailable, with earlier deficiencies tracked to closureNBC Annex E-7; NBCS Annex D-7
Fire safety plan and building information formCurrent, issued to staff, ready for the fire serviceNBC Annex D; NBCS 4.11
Drill records and alarm and PA test logsKept and up to dateNBC 4.11, Annex D; NBCS 4.11
Commissioning certificates and service contractsHeld for every installed fire systemNBC 5.3; NBCS 5.1, 5.3
Fire officerAppointed where the height and use require one4.10

Occupancy, construction and compartmentation

CheckpointWhat the auditor looks forClause
Use of each floorMatches the approved occupancy on the sanctioned plans3.1
Mixed occupancyRated separation between uses; the strictest rules governNBC 3.1.11; NBCS 3.1.11.1
Hazardous materialsNone stored outside approved, protected areas3.1, 4.8
Type of construction and fire resistancePermitted for the use; ratings per Table 1NBC 3.3; NBCS 3.4
False ceilings and interior finishesNon-combustible ceilings; finishes in the permitted flame-spread classNBC 3.3, 3.4.11; NBCS 3.4, 3.5.10
Glazed facade and claddingSprinklers near glazing, openable fire access panels, cladding core acceptableNBC 3.4.10; NBCS 3.5.9
Compartment sizeWithin the limit for the use and sprinkler statusNBC 4.5; NBCS 4.5, Table 6
Compartment wallsContinuous slab to slab, no gaps above the false ceiling4.5
Service shaftsEnclosed and fire-stopped at every floorNBC 3.4.5; NBCS 3.5.4
Fire and smoke dampersFitted where ducts cross barriers and linked to the alarm panelNBC 3.4.8; NBCS 3.5.7
Basement separationRated doors at every stair, lift and service connection4.2.19

Means of egress and staircases

CheckpointWhat the auditor looks forClause
Escape routesWalked from the most remote point to the final exit with nothing stored or parked on them4.2.3
Exit door swingOpens in the direction of escape; no sliding or overhead doors in required exits4.2.9
Exit door sizeAt least 1000 mm clear width (2000 mm in assembly buildings) and 2000 mm high4.4.2.4.1(b)
Exit door lockingOpens from inside without a key whenever the building is occupied4.4.2.4.1(c)
Access-controlled doorsRelease on fire alarm and on power failure, with a manual release beside the door4.4.2.4.1(g)
Travel distanceWithin the table limit for the occupancy4.4.2.2; NBC Table 5; NBCS Table 4
Dead-end corridorsNot over 6 m in educational, institutional and assembly use, 15 m elsewhere4.4.2.2(c)
Number of exitsAt least two per floor, as remote from each other as possible; two for each basement4.4.2.1, 4.2.19
Number and width of staircasesAt least two; width not below the minimum for the occupancy4.4.2.4.3.1, 4.4.2.4.3.2(e)
Stair enclosureRated enclosure and fire door; no ducts, panels, gas pipes or stores in or opening into it4.4.2.4.3.2(a), (d)
Stair terminationEnds at the exit discharge level; basement flight separated from the upper flight4.4.2.4.3.2(h)(11)
Floor indication boardsInside each staircase on every floor4.4.2.4.3.2(h)(9)

Smoke control, escape lighting and signage

CheckpointWhat the auditor looks forClause
Staircase pressurizationDesign pressure achieved with the fans runningNBC 4.4.2.5, Table 6; NBCS 4.4, Table 5
Smoke fan controlFans start from the alarm panel, with a manual override in the fire command centre4.6
Basement smoke ventingNatural vents of at least 2.5 percent of floor area, or mechanical extraction4.6
Smoke exhaust fan ratingRated for high-temperature operation as the code requires4.6
Escape lightingCovers every route, stair and exit, fed from an independent sourceNBC 3.4.7.1; NBCS 3.5.6.1
Escape lighting timingComes on within 5 seconds and lasts at least 90 minutesNBC 3.4.7.1(f); NBCS 3.5.6.1(f)
Exit signsGreen, lit, on an alternative supply, one visible within 30 mNBC 3.4.7.4; NBCS 3.5.6.4
Lift landing signTells occupants to use the stairs in a fireNBC Annex D-4.1

Electrical rooms, gas supply and the fire command centre

CheckpointWhat the auditor looks forClause
Emergency powerAutomatic changeover serves fire pumps, smoke fans, fire lifts, exit signs and escape lightingNBC 3.4.6; NBCS 3.5.5
Electrical shaftSeparate and sealed; no water, drainage or gas lines insideNBC 3.4.6; NBCS 3.5.5
Substation and DG roomsGround floor or first basement, rated enclosure, dyked day tankNBC 3.4.6; NBCS 3.5.5
Large transformersHigh-velocity water spray or nitrogen injection where requiredNBC 3.4.6; NBCS 3.5.5
Fire command centreOn the entrance floor, rated enclosure, main panel, PA, smoke controls and two sets of floor plansNBC 3.4.12; NBCS 3.5.11
Gas pipesNever through staircases, electrical shafts, escape routes or refuge areas4.7
LPG in basementsNo LPG cooking or cylinder storage at basement level4.7, 4.2.19
Kitchen hood interlockHeat detection trips the exhaust and closes the gas solenoid valve4.7; NBC Annex G

Fire detection and alarm

CheckpointWhat the auditor looks forClause
Main panelPowered, no faults, isolations or disabled zones4.9
Detection coverageComplete for the occupancy, detector type suited to each areaNBC 4.9, Table 7; NBCS 4.9, Tables 7A to 7J
Manual call pointsNear every exit on each floor, unobstructed4.9
Voice evacuationMessages in English, Hindi and the local language, audible everywhereNBC 4.9; NBCS 4.9, 5.2
Panel supervisionMonitors tank levels, system pressures and pump statusNBC 4.9, 5.1.1; NBCS 4.9, 5.1
Detector conditionNone painted, covered or removed; tests per IS 2189 recorded5.3; IS 2189

Hydrants, risers, pumps and water storage

CheckpointWhat the auditor looks forClause
ExtinguishersRight type for the risk, mounted, in date, gauge in the greenNBC 5.1.1; NBCS 5.1; IS 2190
Hose reelsAt least 19 mm, on every floor where required, fed from the riser5.1.1(d)
Landing valvesOn every floor in the firefighting lobby, or within 5 m of the stair exit door5.1.1(g)
Hydrant pressureAt least 3.5 bar at the remotest, highest outlet and not over 7.0 bar at any outlet5.1.1(f)
Isolation valvesLocked or strapped open and supervised5.1.1(c)
Static fire tankCapacity per the table for the building, full, in two interconnected compartments5.1.2.1; NBC Table 7; NBCS Tables 7A to 7J
Fire reserveDomestic draw cannot empty the fire quantity5.1.2.1
Pump setMain electric, diesel standby and jockey; selectors in AUTO; auto start on pressure dropNBC 5.1.2.2; NBCS 5.1, Table 7K
Pump roomRated enclosure, positive suction, ventilated, no unrelated storage5.1.2.2
Fire brigade inlet and accessCollecting head reachable from the appliance hardstanding5.1.2.1

Sprinklers and fixed suppression

CheckpointWhat the auditor looks forClause
CoverageThroughout the building where required, not selective5.1.3; IS 15105
Head conditionNot painted, damaged or obstructed; spare heads and spanner kept5.3; IS 15105
Ceiling voidsVoids deeper than 800 mm sprinklered inside5.1.3
Installation control valvesEach serves not over 4500 m2 per floor, open, flow switch on the panel5.1.3
Car parking headsStandard response, K-80, not over 9 m2 per headNBC Annex H-4; NBCS Annex G-4
Areas unsuited to waterServer, UPS and battery rooms on clean agent or other suitable systemsNBC 5.1.6; NBCS 5.2; IS 15493

High-rise provisions

CheckpointWhat the auditor looks forClause
Firefighting shaftRated lobby, stair and fire lift for each tower or compartment, kept clearNBC Annex E; NBCS Annex D
Fire liftRated landing doors, emergency power changeover, fireman switch at entrance levelNBC E-3; NBCS D-3
Refuge area levelsFirst at 24 m, then every 15 m of height (apartment rules differ)NBC E-4; NBCS D-4.2
Refuge area fit-outAt least 15 m2, signed, lit, with PA and talk-back, sprinkleredNBC E-4; NBCS D-4.2
Refuge area useNot enclosed, rented, encroached or used for storageNBC E-4; NBCS D-4.2
Talk-backWorking between firefighting lobbies, refuge areas and the command centreNBC Annex E; NBCS Annex D

Hospitals, assembly, industrial and storage buildings

CheckpointWhat the auditor looks forClause
Hospital compartmentsEach patient floor split into at least two compartments for horizontal evacuation6.3.2
Hospital corridorsAt least 2.4 m clear for bed movement6.3.2
ICU and OTSeparated by rated construction; critical care within the height limitNBC 6.3.2; NBCS 6.3
Assembly exitsNumber of exits matches seating capacity6.4.2
Seating and aislesAisle widths and seats per row within limits6.4.2
Mall circulationKiosks and displays do not block exits, hydrants or call points6.4
Industrial hazard classDeclared class matches the actual processes and materials3.1, Annex B
Separating wallsRated walls between bays carried above the roof as parapetsNBC 6.7.1; NBCS 6.7
Roof and explosion ventingProvided where the hazard and floor area requireNBC Annex M; NBCS Annex K
Storage buildingsExit distance and high-piled sprinkler protection suit the stored goodsNBC 6.8.1; NBCS 6.8, Table 7H

Kitchens, car parking and housekeeping

CheckpointWhat the auditor looks forClause
Commercial kitchen separationRated walls and self-closing doorsNBC Annex G; IS 18271
Hood suppressionWet chemical system that cuts fuel on releaseNBC Annex G; NBCS 5.2; IS 18271
Duct cleaningHood and duct grease cleaning recordedNBC Annex G; IS 18271
Parking alarmManual alarm in car parks above the area threshold and all multi-level car parks4.9
Basement parking ventilationSmoke extraction working as designed4.6
EV chargingLocation, compartment size, isolation and fireman switch as requiredNBCS Annex G-6
Fire doorsNot wedged or tied open; closers and latches work4.4.2.4.1
Terrace doorOpens from the stair side without a keyNBC Annex D; NBCS 4.11
Combustible build-upNone in shafts, plant rooms, ceiling voids or terracesNBC Annex E-7; NBCS Annex D-7
Unauthorised alterationsNo changes to the approved layout without approvalNBC Annex E; NBCS 1.2

What extra does a factory or industrial fire audit cover?

A building audit does not tell you how the work inside a factory is controlled. For factory, storage and hazardous occupancies, Fire Audit Pro adds a Process and Industrial Safety section built on Annex C of IS 14489:2018, the code of practice for occupational safety and health audit, and names the chemical, pressure vessel, boiler and labour laws that apply in the report. Rules not yet held are marked to verify, not guessed.

Process safety checkpoints (IS 14489:2018, Annex C)
CheckpointWhat the auditor looks forClause
Work permitsWritten permits for hot work, confined space, height and electrical isolationC-6
Contractor safetyContractors inducted, trained and supervisedC-7
Statutory registerList of applicable laws with current licences and approvalsC-13
Safety data sheetsCurrent sheet for every chemical, in the local languageC-20.3
Static and lightningVessels and pipes for flammables bonded and earthedC-21.13
Fire teamNamed team on every shift, trained on the plant's risksC-21.1, C-21.12
Emergency planKey people, scenarios, declaration and control room set outC-24

How do you run a fire safety audit, step by step?

  • Collect the documents: fire NOC, occupancy certificate, approved plans, previous audit report, commissioning and maintenance records.
  • Fix the building profile: occupancy group, height, basements, floor areas, sprinklers. This decides which checks apply.
  • Walk every escape route from the most remote point on each floor to the final exit, then each system from tank and pump room to the last outlet.
  • Test the active systems rather than only looking at them: start the pumps, check pressures, trigger a detector, release an access-controlled door.
  • Record each deficiency with its clause, location, measurement, photograph, risk level and corrective action.
  • Write the report, and have it reviewed and signed by the licensed person the state law requires.

What must a fire audit report contain?

A report should follow the order a fire officer reads it in. Fire Audit Pro prints these sections and flags any section not recorded rather than dropping it.

  • Auditor's profile, acknowledgement and the areas covered
  • Basic data of the premises, objective and methodology
  • References: the codes and rule packs actually applied
  • Introduction to risk assessment
  • Observations and recommendations, each with clause and corrective action
  • Legal requirements and compliances for the state
  • The completed checklist and a summary of the audit
  • Code compliance and an adequacy survey of the installed systems

What does a fire audit checklist for Maharashtra add?

Section 3(1) of the Maharashtra Fire Prevention and Life Safety Measures Act, 2006, as substituted in 2023, requires measures not less than both Part 4 of the National Building Code and Schedule I of the Act, maintained in good repair and efficient condition.

Form B: under section 3(3) and rule 4(2) of the 2009 Rules, the owner or occupier furnishes a Licensed Agency's certificate twice a year, in January and July, that the measures are maintained in good repair and efficient condition. The 2025 Amendment Rules added that it covers the preceding six months and the National Building Code and Indian Standards. The printed title reads: "Six monthly certificate to be given in every January and July by the owner or the occupier for compliance of the Fire Prevention and Life Safety Measures".

Section 45A biennial audit: for buildings listed in section 45(1), a licensed Fire and Life Safety Auditor must carry out the audit, first within one year of the 2023 Amendment Act coming into force and "thereafter, once in every two years". The auditor issues the certificate in Form V (rule 31), and only a licensed auditor may do the work (section 45A(7)).

Maharashtra audit duties at a glance
ItemRequirementSource
Buildings under section 45AHotel, hospital, business, mercantile or mixed use above 30 m; residential above 70 m; refineries, LPG bottling plants and similar; industrial of moderate hazard 30,000 m2 or more, or high hazard 10,000 m2 or moreAct s.45(1)
Audit frequencyFirst within one year of the 2023 Amendment Act, then once in every two yearsAct s.45A(1)
Auditor's duties360-degree hazard assessment, test all active measures, evaluate the fire control room and staff training, dated photographs signed by the owner's representativeRule 33
Auditor's certificateForm V, with the fire audit report, to the owner or occupierRules 31 and 33(ix)
Form BEvery January and July, by a Licensed AgencyAct s.3(3); rule 4(2)
SubmissionIn person, registered post, courier or onlineRule 4(5); rule 31(b)

Sources

  • Maharashtra Fire Prevention and Life Safety Measures Act, 2006, sections 3(1), 3(3), 45(1) and 45A as amended: Maharashtra Fire Prevention and Life Safety Measures (Amendment) Act, 2023 (Mah. XXIV of 2023), sections 3 and 22, Maharashtra Government Gazette Extraordinary Part VIII, 11 May 2023
  • Maharashtra Fire Prevention and Life Safety Measures Rules, 2009, rule 4 and Form B: Maharashtra Government Gazette Extraordinary Part IV-B, 23 June 2009, Form B at page 18
  • Maharashtra Fire Prevention and Life Safety Measures (Amendment) Rules, 2025, rules 4, 31, 33 and Form V: Maharashtra Government Gazette Extraordinary Part IV-B, 12 June 2025, Urban Development Department notification No. MFS-2023/C.R.370/UD-14
  • National Building Code of India 2016, Part 4 Fire and Life Safety: Bureau of Indian Standards; clause numbers cited, text paraphrased
  • SP 7 : 2026 National Building Construction Standards, Part F Fire and Life Safety: Bureau of Indian Standards; clause numbers cited, text paraphrased
  • IS 14489:2018, Code of practice on occupational safety and health audit, Annex C: Bureau of Indian Standards; clause numbers as used in Fire Audit Pro
  • IS 2189, IS 2190, IS 15105, IS 15493, IS 18271: Bureau of Indian Standards; referenced for detection, extinguishers, sprinklers, gaseous systems and commercial kitchens
  • Fire Audit Pro checklist and report model: Siya Habitats, siyahabitats.com/fire-audit-pro/

This guide explains the rules in plain words. It is not legal advice; the gazette text and the fire authority decide. A licensed person reviews and signs any submission.

FAQ

Questions people ask

What is a fire safety audit checklist?

It is the list of fire and life safety requirements an auditor checks in a building, with the clause each one comes from. In India the national basis is Part 4 of NBC 2016 (Part F of NBCS 2026), read with the state fire law.

Which code should a fire audit in India follow, NBC 2016 or NBCS 2026?

Fire is a state subject, so the state law decides. Maharashtra's Act requires measures not less than Part 4 of the National Building Code and Schedule I. Fire Audit Pro holds both editions side by side so the difference is visible.

How often is a fire audit required in Maharashtra?

For buildings listed in section 45(1) of the Act, section 45A(1) requires an audit by a licensed Fire and Life Safety Auditor once in every two years. Separately, every building needs a Form B certificate from a Licensed Agency each January and July.

Who can carry out a fire audit in Maharashtra?

Section 45A(7) says no person other than a licensed Fire and Life Safety Auditor may carry out the work of fire audit. The licence is granted by the Director under section 45A(2).

What is Form B in Maharashtra?

Form B is the six-monthly certificate, given in January and July under section 3(3) and rule 4(2), that the fire prevention and life safety measures were maintained in good repair and efficient condition. Since the 2025 Amendment Rules it covers the preceding six months.

Is there a fire audit checklist pdf?

You can print this page. Fire Audit Pro produces a checklist tailored to the building and a report as PDF from the same data, which is more useful than a generic list.

Does a factory need a different fire audit checklist?

Yes. On top of the building items it needs process and industrial safety checks such as work permits, contractor control, chemical data sheets, static earthing and the emergency plan, which Fire Audit Pro cites to IS 14489:2018 Annex C.

Can software sign a fire audit?

No. Software assists. The audit certificate must be signed by the licensed person the state law names, such as a licensed Fire and Life Safety Auditor in Maharashtra.