Guide: fire norms by building height

Fire safety requirements by building height and occupancy in Maharashtra

In Maharashtra the minimum fire installations for a building are fixed by Schedule I of the Maharashtra Fire Prevention and Life Safety Measures Act 2006, as substituted in 2023, read by occupancy and height band. For apartments (A-4), a whole-building automatic sprinkler system is required only above 45 m; below that, sprinklers are required in a basement larger than 200 sq m (Note 4). Offices (E) need sprinklers above 15 m, and hotels (A-5) and hospitals (C-1) need them from 15 m. Every row is read together with the notes it cites, and the national code (NBC 2016 Part 4, NBCS 2026 Part F) and the Indian Standards give the design detail.

Updated 2026-10-08 · By the Siya Habitats fire safety engineering team, Nagpur · Every rule cited to its source

What sets fire norms by building height in Maharashtra?

Section 3(1) of the Maharashtra Fire Prevention and Life Safety Measures Act 2006, as substituted by the Amendment Act of 2023 (Mah. XXIV of 2023), requires the owner, or the occupier where the owner is not traceable, of any building classified in Schedule I to obtain a Provisional, Final or Renewal Fire Safety Approval. The measures provided must be those recommended in that approval, and they may not be less than the minimum fire safety installations in Part 4 of the National Building Code of India and those specified against the building in Schedule I.

Schedule I is therefore the binding state matrix. It was substituted by section 24 of the 2023 Amendment Act, published in the Maharashtra Government Gazette Extraordinary on 11 May 2023. It lists occupancy groups down the side (residential A, educational B, institutional C, assembly D, business E, mercantile F, industrial G, storage H, hazardous J), splits each group into rows by height, floor area, persons or storeys, and gives one column per fire installation.

The columns are: fire extinguisher, first aid hose reel, down comer, wet riser, yard hydrant, automatic sprinkler system, manually operated electric fire alarm (MOEFA), automatic detection and alarm, underground static water tank, terrace water tank, and the pumps for each tank. A cell reads R (required), NR (not required), a quantity in litres or litres per minute, or a reference to one or more notes.

How do you read a Schedule I row?

Find the occupancy group first, then the row whose height band, floor area or headcount matches the building. Read every cell in that row, then read every note the row heading and each cell cite. The notes are not footnotes in the casual sense: they narrow or widen what the cell means, and some of them replace the cell entirely.

Height in these tables is the building height used for fire purposes. Get it from the approved sections, measured the way the applicable building regulations define it, not from the highest level number printed on a drawing.

Three conventions recur. A cell marked R with Note 4 means the system is required in the basement only, where the basement area exceeds 200 sq m. A quantity followed by a second figure in brackets with Note 6 means the bracketed figure is added if the basement exceeds 200 sq m. A cell that reads only Notes 18, 19, 21(a) and 21(b), as in the larger industrial and storage rows, means the protection is designed to the relevant Indian Standards rather than read from the table.

  • Note 1: MOEFA includes a talk back system and a public address system in all buildings 15 m and above, except A-3 and A-4, where these are needed from 24 m. They are also needed in car parks over 300 sq m and in every multi-level car park.
  • Note 2: automatic detection is not needed in the car parking area itself, but is needed in electrical rooms, cabins and storage areas within it.
  • Note 8: in a complex with mixed occupancies, the most restrictive provisions of the National Building Code applicable to the individual occupancies govern.
  • Note 9: the overhead tank (and terrace pump where listed) is provided for each building or tower, attached or detached, and is connected to the sprinklers, down comers and hose reels.
  • Notes 15(a) and 15(b): sprinklers are fed from both the underground and terrace tanks where both are prescribed, and the entire building, common and livable areas, is sprinklered to the relevant Indian Standard.
  • Note 21(a): where pumping capacities are not given in the table, the Indian Standard codes for hydrants, sprinklers and water spray apply, and design and installation must follow codes such as IS 13039, IS 15105 and IS 15325.

Which fire systems do apartment buildings (A-4) need at each height?

Dormitories (A-3) and apartment houses (A-4) share one block of Schedule I, which cites Notes 8 and 22. The table shows the five height rows. Note the step at 15 m, where a down comer, MOEFA and a 25,000 litre terrace tank come in, and the step above 35 m, where the down comer gives way to a wet riser and an underground tank.

Schedule I, Dormitories (A-3) and Apartment Houses (A-4). R = required, NR = not required, R (Note 4) = in a basement over 200 sq m only
Schedule I rowExtinguisherHose reelDown comerWet riserYard hydrantSprinklerMOEFAAuto detectionUG tank (L)Terrace tank (L)Terrace pump (LPM)
Row (1), less than 15 mRRNRNRNRR (Note 4)NRNRNR5,000450 (plus 450 if basement over 200 sq m, Note 6)
Row (2), 15 m to 35 mRRRNRNRR (Note 4)RNRNR25,000900
Row (3), above 35 m to 45 mRRNRRNRR (Note 4)RNR75,0005,000NR
Row (4), above 45 m to 60 mRRNRRRRRNR150,00010,000NR
Row (5), above 60 mRRNRRRRRR200,00010,000NR

So when is a sprinkler required in a Maharashtra apartment building? Throughout the building only above 45 m (rows 4 and 5). Up to 45 m the cell reads R with Note 4, which limits it to a basement over 200 sq m. Automatic detection appears only in the row above 60 m.

What about lodging houses and private dwellings (A-1, A-2)?

Lodging and rooming houses (A-1) and one or two family private dwellings (A-2) have their own block, which cites Note 3(d). Note 3(d) says buildings above 45 m are not permitted for A-1 and A-2, so the block stops at 45 m.

Schedule I, Lodging and Rooming Houses (A-1) and One or two Family Private Dwellings (A-2)
Schedule I rowExtinguisherHose reelDown comerWet riserYard hydrantSprinklerMOEFAAuto detectionUG tank (L)Terrace tank (L)Terrace pump (LPM)
Row (1), less than 15 mRNRNRNRNRR (Note 4)NRNRNR5,000 (Note 5: only if basement over 200 sq m)NR
Row (2), 15 m to 35 mRRRNRNRR (Note 4)RNRNR25,000900
Row (3), above 35 m to 45 mRRNRRNRR (Note 4)RR75,0005,000NR

When do hotels (A-5) need sprinklers?

Hotels (A-5) below 15 m are split by the largest floor area on any floor. A hotel with a floor over 1,000 sq m needs sprinklers throughout, a wet riser, a yard hydrant and a 100,000 litre underground tank even below 15 m. From 15 m every hotel needs the full set. The terrace tank figures in the A-5 rows below 30 m are marked disputed in our rule store because the printed cell reads oddly against its note, so they are left out here; read them from the gazette before relying on a figure.

Schedule I, Hotels (A-5) (Notes 8 and 22). Terrace tank below 30 m omitted: transcription disputed
Schedule I rowExtinguisherHose reelDown comerWet riserYard hydrantSprinklerMOEFAAuto detectionUG tank (L)Terrace tank (L)Terrace pump (LPM)
Row (1)(i), below 15 m, floor area up to 500 sq mRRNRNRNRR (Note 4)RNRNRSee gazette450
Row (1)(ii), below 15 m, floor area 500 to 1,000 sq mRRRNRNRR (Note 4)RRNRSee gazette450
Row (1)(iii), below 15 m, floor area over 1,000 sq mRRNRRRRRR100,000See gazetteNR
Row (2), 15 m to 30 mRRNRRRRRR150,000See gazetteNR
Row (3), above 30 mRRNRRRRRR200,00020,000NR
Hotels (A-6), allRRNRRRRRR250,00020,000NR

What do educational buildings (B) need?

Note 3(f) permits educational buildings above 30 m only for higher secondary education and above, subject to local firefighting facilities, and section 3(1B) of the Act, inserted in 2023, allows educational buildings above 30 m and up to 45 m in Municipal Corporation and Special Planning Authority areas if they meet Schedule I. The sprinkler and detection cells of row (4) are marked disputed in our rule store, because the printed cell carries no note reference where comparable rows do, so they are shown as such.

Schedule I, Educational Buildings (B). Terrace tank for rows (3) and (4) is not held in our rule store
Schedule I rowExtinguisherHose reelDown comerWet riserYard hydrantSprinklerMOEFAAuto detectionUG tank (L)Terrace tank (L)Terrace pump (LPM)
Row (1), less than 15 mRRRNRNRR (Note 4)NRNRNR10,000450
Row (2), 15 m to 24 mRRRNRNRR (Note 4)RNRNR25,000900
Row (3), above 24 m to 30 mRRNRRNRR (Note 4)RNR50,000Not heldNR
Row (4), above 30 m to 45 m (Note 3(f))RRNRRNRDisputedRDisputed75,000Not held450

What do hospitals and nursing homes (C-1) need?

Hospitals, sanatoria and nursing homes (C-1) below 15 m are split by storeys and by whether the building has beds. A ground plus two or more storey hospital with beds needs sprinklers throughout, a wet riser and a 50,000 litre underground tank even though it is below 15 m. Note 3(e) allows C-1 buildings above 45 m only if they are in consonance with the parameters of the National Fire Protection Association (USA) for such occupancies.

Schedule I, Hospitals, Sanatoria and Nursing Homes (C-1)
Schedule I rowExtinguisherHose reelDown comerWet riserYard hydrantSprinklerMOEFAAuto detectionUG tank (L)Terrace tank (L)Terrace pump (LPM)
Row (1)(i), below 15 m, up to G+1, no bedsRRNRNRNRR (Note 4)RNRNR2,500Not held
Row (1)(ii), below 15 m, up to G+1, with bedsRRNRNRNRR (Note 4)RNRNR5,000450
Row (1)(iii), below 15 m, G+2 or more, no bedsRRRNRNRR (Note 4)RRNR10,000900
Row (1)(iv), below 15 m, G+2 or more, with bedsRRNRRNRRRR50,00010,000NR
Row (2), less than 15 m, plot over 1,000 sq mRRNRRRRRR100,00010,000NR
Row (3), 15 m to 30 mRRNRRRRRR150,00020,000NR
Row (4), above 30 m to 45 mRRNRRRRRR200,00020,000NR
Row (5), above 45 m (Note 3(e))RRNRRRRRR200,000 plus 5,000 per 5 m above 45 m20,000 plus 5,000 per 5 m above 45 mNR

What do assembly (D), business (E) and mercantile (F) buildings need?

Note 3(b) does not permit assembly (D) and mercantile (F) buildings, or custodial and penal institutions (C-2, C-3), above 30 m. Business buildings (E) have no such cap. For offices the sprinkler threshold is clear: R with Note 4 (basement only) up to 15 m, and R throughout above 15 m. For assembly buildings sprinklers are required throughout from above 10 m.

Schedule I, Assembly (D-1 to D-5), Business (E) and Mercantile (F-1, F-2)
Schedule I rowExtinguisherHose reelDown comerWet riserYard hydrantSprinklerMOEFAAuto detectionUG tank (L)Terrace tank (L)Terrace pump (LPM)
D-1 to D-5, row (1)(i), below 10 m, up to 300 personsRRRNRNRR (Note 4)RNRNR20,000450
D-1 to D-5, row (1)(ii), below 10 m, over 300 personsRRRNRNRR (Note 4)RNRNR25,000900
D-1 to D-5, row (2), above 10 m to 15 mRRNRRRRRR100,0005,000NR
D-1 to D-5, row (3), above 15 m to 24 mRRNRRRRRR150,00010,000NR
D-1 to D-5, row (4), above 24 m to 30 mRRNRRRRRR200,00020,000NR
E, row (1), less than 10 mRRRNRNRR (Note 4)RNRNR10,000450 (plus 450, Note 6)
E, row (2), above 10 m to 15 mRRNRRNRR (Note 4)RR50,0005,000NR
E, row (3), above 15 m to 24 mRRNRRRRRR100,00010,000NR
E, row (4), above 24 m to 30 mRRNRRRRRR150,00020,000NR
E, row (5), above 30 mRRNRRRRRR200,00020,000NR
F-1, F-2, row (1)(i), G+1, total floor area up to 500 sq mRRNRNRNRR (Note 4)NRNRNR5,000450
F-1, F-2, row (1)(ii), G+1, total floor area over 500 sq mRRRNRNRR (Note 4)RNRNR20,000900
F-1, F-2, row (1)(iii), more than G+1RRRNRNRR (Note 4)RNRNR25,000900
F-1, F-2, row (2), above 15 m to 24 mRRNRRNRRRR100,00010,000NR
F-1, F-2, row (3), above 24 m to 30 mRRNRRRRRR200,00020,000NR
F-3, underground shopping complexRRNRRRRRR150,00010,000NR
D-6RRNRRRRRR200,00020,000NR

D-7 is not tabulated in Schedule I: every cell refers to D-7 of Table 7 of Part 4 of the National Building Code of India.

What do industrial (G) and storage (H) buildings need?

Industrial rows are split by the aggregate floor area of the largest building on the plot, not by height. Note 3(c) does not permit industrial buildings above 24 m unless required for the process, nor storage buildings above 24 m; Note 3(g) allows storage between 15 m and 24 m subject to local firefighting facilities. Note 16(a) limits artisan, village, cottage and tiny sector units to extinguishers and fire buckets, and Note 16(b) treats several industries in one building as moderate hazard with no high hazard occupancy allowed.

Where a row reads Notes 18, 19, 21(a) and 21(b), the whole occupancy is protected by hydrants, sprinklers, water spray, water mist, gas systems, foam and alarms as applicable under the relevant Indian Standards. That covers G-1 above 5,000 sq m, G-2 above 2,000 sq m, all G-3, storage row (2) and storage above 15 m.

Schedule I, Industrial (G) and Storage (H). Notes = Notes 18, 19, 21(a) and 21(b) govern the cell
Schedule I rowExtinguisherHose reelWet riserYard hydrantSprinklerMOEFAAuto detectionUG tank (L)
G-1 (i), up to 500 sq mRNRNRNRNRNRNR10,000
G-1 (ii), 500 to 2,000 sq mRRNRRNRNRNR25,000
G-1 (iii), 2,000 to 5,000 sq mRRRRNRRNR50,000
G-1 (iv), over 5,000 sq mRRNotesNotesNotesNotesNotesNotes
G-2 (i), up to 1,000 sq mRRNRRNRNRNR50,000
G-2 (ii), 1,000 to 2,000 sq mRRRRNRRNR75,000
G-2 (iii), over 2,000 sq mRRNotesNotesNotesNotesNotesNotes
G-3, high hazardRRNotesNotesNotesNotesNotesNotes
H row (1), below 15 m, covered area under 1,000 sq mRRRNRR (Note 4)NRNR50,000
H row (2), sub-rows I to IIIRRNotesNotesNotesNotesNotesNotes
H row (3), above 15 m to 24 mRRNotesNotesNotesNotesNotesNotes
H row (4), multi-level car parkingRRRRRRNR150,000
H row (5), mechanized automated parkingRRNRRRNRR50,000

Is the fire NOC height 15 m or 24 m in Maharashtra?

Online answers conflict, so here is what the binding texts in our rule store do and do not say. Section 3(1) of the Act, as substituted in 2023, applies the approval requirement to the owner or occupier of any building classified in Schedule I. Schedule I itself starts below 15 m: every occupancy group has a row for buildings less than 15 m (or less than 10 m), with at least an extinguisher required. The Act text we hold sets no 15 m or 24 m floor below which fire safety approval is not needed.

Two figures in the texts are often confused with an NOC threshold. First, 15 m is where most Schedule I rows step up (down comer or wet riser, MOEFA with public address under Note 1, bigger tanks), and the fee note in Schedule II says no fire and emergency service fee is levied for A-2 and A-4 buildings below 15 m. That is a fee exemption, not an exemption from the Act. Second, 24 m is a band boundary for educational, institutional, assembly, business, mercantile and storage rows, the limit for industrial and storage buildings under Note 3(c), and the height from which A-3 and A-4 buildings need talk back and public address under Note 1.

Whether a particular planning authority routes a small residential building below 15 m to the Chief Fire Officer for a separate NOC is set by the local building regulations and practice, which our rule store does not hold. Check with the authority that sanctions the plan, and do not rely on a blog figure.

Where does the design detail come from?

Schedule I says what must be provided and in some cases how much water. It does not say how a system is designed. Section 3(1) makes Part 4 of the National Building Code of India the floor for the measures, and Note 21(a) sends the hydrant, sprinkler and spray design to the Indian Standards, naming IS 13039, IS 15105 and IS 15325 as examples. Exits, travel distance, staircases, refuge areas and fire lifts are also in NBC 2016 Part 4, and in its successor NBCS 2026 Part F for buildings to which it applies.

We do not reproduce NBC, NBCS or IS text here because it is BIS copyright. Read those clauses in a licensed copy, or ask Fire Code Expert, which cites the clause number in its answer.

Sources

  • Maharashtra Fire Prevention and Life Safety Measures Act 2006, Schedule I, substituted by Mah. 24 of 2023 s.24: Maharashtra Government Gazette Extraordinary Part Eight, 11 May 2023. All tables on this page: rows and columns as named in each table.
  • Maharashtra Fire Prevention and Life Safety Measures Act 2006, Schedule I, substituted by Mah. 24 of 2023 s.24; Schedule I, Dormitories (A-3) Apartment Houses (A-4) (Notes 8 and 22), row (4), column Automatic sprinkler system; Maharashtra Government Gazette Extraordinary Part Eight, 11 May 2023: Sprinklers throughout above 45 m for A-3 and A-4.
  • Maharashtra Fire Prevention and Life Safety Measures Act 2006, Schedule I, substituted by Mah. 24 of 2023 s.24; Schedule I, Dormitories (A-3) Apartment Houses (A-4) (Notes 8 and 22), row (2), column Automatic sprinkler system; Maharashtra Government Gazette Extraordinary Part Eight, 11 May 2023: R with Note 4 (basement over 200 sq m) for 15 m to 35 m.
  • Maharashtra Fire Prevention and Life Safety Measures Act 2006, Schedule I, substituted by Mah. 24 of 2023 s.24; Schedule I, Above 15 m and up to 24 m in height, row (3), column Automatic sprinkler system; Maharashtra Government Gazette Extraordinary Part Eight, 11 May 2023: Business Buildings (E): sprinklers above 15 m.
  • Maharashtra Fire Prevention and Life Safety Measures Act 2006, Schedule I, substituted by Mah. 24 of 2023 s.24; Schedule I, Hotels (A-5) (Notes 8 and 22), row (2), column Automatic sprinkler system; Maharashtra Government Gazette Extraordinary Part Eight, 11 May 2023: Hotels 15 m to 30 m.
  • Maharashtra Fire Prevention and Life Safety Measures Act 2006, Schedule I, substituted by Mah. 24 of 2023 s.24; Schedule I, Hospitals, Sanatoria and Nursing Homes (C-1) (see note 3 (e)), row (3), column Automatic sprinkler system; Maharashtra Government Gazette Extraordinary Part Eight, 11 May 2023: Hospitals 15 m to 30 m.
  • Maharashtra Fire Prevention and Life Safety Measures Act 2006, Schedule I, substituted by Mah. 24 of 2023 s.24; Schedule I, Note 1; Maharashtra Government Gazette Extraordinary Part Eight, 11 May 2023: MOEFA with talk back and public address, 15 m, and 24 m for A-3 and A-4.
  • Maharashtra Fire Prevention and Life Safety Measures Act 2006, Schedule I, substituted by Mah. 24 of 2023 s.24; Schedule I, Notes 2, 3(a) to 3(h), 4, 5, 6, 8, 9, 15(a), 15(b), 16(a) to 16(c), 18, 19, 21(a), 21(b); Maharashtra Government Gazette Extraordinary Part Eight, 11 May 2023: Notes scoping the rows, as summarised on this page.
  • Maharashtra Fire Prevention and Life Safety Measures Act, 2006 (Mah. III of 2007), s.3(1) as substituted by s.3 of Mah. XXIV of 2023: Approval duty for buildings classified in Schedule I; NBC Part 4 and Schedule I as the minimum.
  • Maharashtra Fire Prevention and Life Safety Measures (Amendment) Act, 2023 (Mah. XXIV of 2023), section 3 (amends section 3); Maharashtra Government Gazette Extraordinary Part VIII, 11 May 2023: Section 3(1B): educational buildings above 30 m; section 3(1C): storage buildings.
  • Maharashtra Fire Prevention and Life Safety Measures (Amendment) Act, 2023 (Mah. XXIV of 2023), section 24 (amends schedule I); Maharashtra Government Gazette Extraordinary Part VIII, 11 May 2023: Schedule II fee note 5: no fee for A-2 and A-4 below 15 m.
  • National Building Code of India 2016, Part 4 Fire and Life Safety; NBCS 2026 Part F: Named only; design detail. Text not reproduced (BIS copyright).

This guide explains the rules in plain words. It is not legal advice; the gazette text and the fire authority decide. A licensed person reviews and signs any submission.

FAQ

Questions people ask

Above what height is a sprinkler system required in a Maharashtra apartment building?

Under Schedule I of the Maharashtra Fire Prevention and Life Safety Measures Act 2006, as substituted in 2023, apartment houses (A-4) need sprinklers throughout the building only above 45 m (rows 4 and 5). From below 15 m up to 45 m the cell reads R with Note 4, which means sprinklers are required in a basement whose area exceeds 200 sq m.

Is a sprinkler required in an office building above 15 m in Maharashtra?

Yes. Schedule I, Business Buildings (E), row (3), above 15 m and up to 24 m, reads R for the automatic sprinkler system with no limiting note, and so do rows (4) and (5). Below 15 m the cell is limited by Note 4 to a basement over 200 sq m.

When is a wet riser required instead of a down comer?

It depends on the occupancy row. For apartments (A-3, A-4), Schedule I requires a down comer from 15 m to 35 m (row 2) and a wet riser above 35 m (rows 3 to 5). For offices (E) the wet riser starts above 10 m (row 2), and for educational buildings above 24 m (row 3).

What is the fire water tank capacity for a 45 m apartment building?

Schedule I, A-3 and A-4, row (3), above 35 m but not exceeding 45 m, gives an underground static water tank of 75,000 litres and a terrace tank of 5,000 litres. Above 45 m (row 4) the figures become 150,000 and 10,000 litres. Note 9 requires the terrace tank for each building or tower.

Is a public address system required in a high rise building in Maharashtra?

Note 1 of Schedule I says the manually operated electric fire alarm system includes a talk back system and a public address system in all buildings 15 m and above. For A-3 and A-4 occupancies these are required from 24 m. They are also required in car parks over 300 sq m and in all multi-level car parks.

Is a fire NOC required for a building below 15 m in Maharashtra?

Section 3(1) of the Act, as substituted in 2023, applies to any building classified in Schedule I, and Schedule I has rows below 15 m for every occupancy. Schedule II exempts A-2 and A-4 buildings below 15 m from the fire service fee only. Whether your planning authority processes a separate Chief Fire Officer NOC for such a building is set by local regulations, which we do not hold, so confirm with that authority.

What does R (Note 4) mean in Schedule I?

R means required. Note 4 says the system is required to be installed in the basement if the basement area exceeds 200 sq m. So a cell reading R with Note 4 does not require the system throughout the building.

Which code gives the sprinkler and hydrant design details?

Schedule I Note 21(a) says design and installation of hydrant, sprinkler and spray systems shall strictly follow the Indian Standard codes of practice such as IS 13039, IS 15105 and IS 15325, and section 3(1) of the Act sets Part 4 of the National Building Code of India as the minimum. NBCS 2026 Part F is the successor to NBC 2016 Part 4.