Guide: national fire code

NBC 2016 Part 4 vs NBCS 2026 Part F: what changed for fire safety

NBCS 2026 Part F (SP 7 : 2026) is the successor to NBC 2016 Part 4. The main fire safety changes are a high-rise threshold of 24 m instead of 15 m, an occupancy-wise applicability table, a new mixed-use Group K and data centre group, protection levels in Tables 7A to 7J, longer travel distances for sprinklered buildings, larger sprinklered car park compartments, new EV and battery rules, and a formal audit method in Annex D-7. Part F describes itself as voluntary guidance, so a building is still judged by the state law and bye-laws that apply where it stands, and by the code in force when it was sanctioned.

Updated 2026-10-08 · By the Siya Habitats fire safety engineering team, Nagpur · Every rule cited to its source

What is NBCS 2026 Part F and how does it relate to NBC 2016 Part 4?

The National Building Code of India 2016 (SP 7 : 2016) put fire safety in Part 4, Fire and Life Safety. Its 2026 revision is published by the Bureau of Indian Standards as SP 7 : 2026, the National Building Construction Standards (NBCS). Fire safety now sits in Part F, Fire and Life Safety, which runs to 269 pages.

The basic layout is familiar. Both documents start with scope and terminology, then fire prevention (occupancy classification and construction types), life safety (exits, occupant load, egress, compartmentation, smoke control, detection) and fire protection (extinguishers, hydrants, sprinklers and other systems), followed by occupancy-specific clauses and annexes. Many clause numbers line up, but several tables were renumbered and some annexes were re-lettered, so a clause reference from one edition should never be assumed to point to the same rule in the other.

The most important difference is legal, not technical. The title page and foreword of Part F describe it as guidance for state governments and local authorities, voluntary and non-binding. In our own count of the document, the word should appears about 1,740 times and shall only 3 times, all in boilerplate. Part F therefore binds a building only when a state or local authority adopts it.

What changed for fire safety? The change table

The table below summarises the changes that matter most on site and on drawings. It is written in our own words with clause and table numbers only. It does not reproduce text from either code, both of which are copyright of the Bureau of Indian Standards. Read the clause in your own licensed copy before relying on any value.

NBC 2016 Part 4 compared with NBCS 2026 Part F (summary, own words)
TopicNBC 2016 Part 4NBCS 2026 Part FWhat it means in practice
Legal forceCode referred to by state bye-laws and fire rulesDescribed in its own foreword as voluntary guidance; written mostly as shouldNot enforceable on its own until a state or local authority adopts it
High-rise definition15 m or more (clause 2.38)24 m or more (clause 2.39)Buildings between 15 m and 24 m drop out of the high-rise annex under Part F, but state law may still set 15 m
ApplicabilityAll high-rise buildings plus listed special buildings (clause 1.2)Occupancy-wise height and floor area triggers, for example residential 24 m or 750 square metres, educational 9 m or 500 square metres, business 15 m or 750 square metres (clause 1.2)Check the occupancy row first; also applies on alterations of 1,000 square metres or more and on change of occupancy
Small buildingsNo separate routeA self-certification route for buildings up to 500 square metres below the height trigger, by a state-approved professional (clause 1.2)Works only where the state sets up such a professional scheme
Height restrictionsTable 7 marks some occupancy and height combinations as not permittedThese height prohibitions are removedTaller buildings of some occupancies become possible, but need the higher protection levels
Assembly occupancySubdivided D-1 to D-7 (clause 3.1)Single Group D without subdivisions (clause 3.1)Exit and seating rules now key off occupant numbers rather than the subdivision letter
Mixed useMost restrictive provisions apply, with separation (clause 3.1.11)New Group K with a separation matrix; a minor occupancy up to 30 percent follows the main one (clause 3.1.11)Some occupancy pairs are not permitted together; separation ratings depend on the pair
Data centresWithin business sub-group E-3Own sub-group E-II with Annex F and rules for lithium-ion backupData halls get their own occupant load, travel distance and suppression choices
Minimum fire installationsOne master Table 7 by occupancy and heightTables 7A to 7J by occupancy, using hose levels HL-1 to HL-6 (Table 7M) and combined sprinkler and hose levels CL-1 to CL-8 (Table 7K)System design starts by finding the HL or CL level, which fixes flows, pumps and duration
Occupant loadTable 3, for example business 10 and educational 4.0 square metres per personTable 2, for example business 7.1 and educational 3.0 square metres per person, with net and gross areas distinguishedMore people assumed per floor in offices and schools, so exit widths can increase
Travel distanceTable 5, with a 50 percent increase for fully sprinklered buildingsTable 4 with its own sprinklered column, for example 60 m for residential and business in Type 1 and 2 constructionSprinklered residential and office floors can have longer travel than under NBC 2016
Staircase flightsUp to 12 risers per flightUp to 15 risers per flight (clause 4.4.2.4.3)Check which edition the sanctioned drawings followed before marking a flight non-compliant
CompartmentationDefault 750 square metres; sprinklered basement car park up to 3,000 (clause 4.5)Table 6; sprinklered basement car park up to 5,000; barrier types A to E; critical utility rooms 2 hours regardless of size (clause 4.5)Fewer compartments in sprinklered car parks, but electrical, UPS, battery and server rooms always need 2 hour enclosure
Basement water curtainsWater curtain allowed as a compartment barrier in car parksThat route is deletedUse a listed barrier type instead of a drencher line
Sleeping corridors60 minute walls with 20 minute doors (clause 4.6)60 minute walls with 30 minute doors (clause 4.6)Hotel and hostel room doors need a higher rating
Detection and suppression choiceGeneral requirements by systemTables 9 to 11 match about 24 risk types, such as UPS rooms, lithium-ion, kitchens, transformers and DG sets, to suitable technologiesRoom-by-room selection of detection and suppression becomes a table lookup
Car parks and EVsAnnex H car parkingAnnex G with EV provisions: not below the first basement, chargers near the entrance, smaller EV compartments, a fireman's isolation switch, and higher protection levelsNew EV charging in basements needs early planning with the fire scheme
Performance-based designNot provided as a full routeAnnex M sets a performance-based route, mainly for heritage buildingsAn alternative where prescriptive rules cannot be met, subject to the authority
Fire and life safety auditAnnex E-7: buildings above 15 m, third party, every 2 yearsAnnex D-7: high-rise buildings, every 2 years, preferably third party, with a defined method and a compliance, partial compliance or non-compliance ratingAudit reports gain a standard structure; frequency stays at 2 years
PressurisationStairs 50 Pa, lobbies 25 to 30 Pa (Table 6)Same pressures (Table 5)No change in the target values, only the table number

Why does the 24 m high-rise threshold matter so much?

Under NBC 2016, a building of 15 m or more is high-rise, and many of the heavier requirements, such as fire fighting shafts and the two-yearly third party audit in Annex E-7, are tied to that status. NBCS 2026 moves the line to 24 m in clause 2.39 and lists the high-rise extras in Annex D.

The practical effect is on the 15 m to 24 m band, which covers a large share of mid-rise apartments and offices. Under Part F alone, such a building is not high-rise. That does not mean it needs no fire protection. The occupancy rows in clause 1.2 and Tables 7A to 7J still set what it must have, and the state's own fire rules still apply. In Delhi, for example, rule 27 of the Delhi Fire Service Rules 2010 as amended in 2025 still lists residential and business buildings above 15 m or five storeys as needing a fire safety certificate. A change in the national code does not change a state threshold.

Which code applies to my building: NBC 2016 or NBCS 2026?

Fire is a state subject in India. What decides a fire NOC, an occupancy approval or a fire audit is the state fire Act, its rules and the local building bye-laws. Those instruments usually adopt the national code by reference, so the national code binds only through them.

Two questions settle the answer for a given building. First, what does the state instrument point to? If the bye-laws or fire rules name NBC 2016, or say the National Building Code as amended from time to time and the state has not yet adopted the 2026 edition, the 2016 code is what is enforced. Our research up to September 2026 found no state that had formally adopted NBCS 2026, and Delhi and Maharashtra material still refers to the 2016 code. Second, when was the building sanctioned? A building is generally judged against the code in force when its plans were approved. A building sanctioned in 2018 is checked against NBC 2016 even after a state adopts NBCS 2026, unless the state applies the new code to existing buildings or the building is altered or changes occupancy.

Delhi is a useful example. The Delhi Fire Service (Amendment) Rules 2025 replaced the reference in rule 33 to the National Building Code of India 2005 with a reference to the National Building Code of India, and Delhi's Unified Building Bye-Laws 2016 point to the national code through rule 33. Which edition that means for a given building is a question for Delhi Fire Service until it says more.

How the applicable code is decided
SituationCode usually appliedWhy
Building sanctioned before 2026NBC 2016 Part 4, through state lawJudged against the code in force at sanction
Building sanctioned in 2026 or later, state has not adopted NBCS 2026NBC 2016 Part 4 as embodied in state law, with NBCS 2026 as good practicePart F is voluntary until adopted; jurisdiction decides
Building sanctioned after the state adopts NBCS 2026NBCS 2026 Part F with the state's modificationsAdopted code becomes binding through state law
Alteration or change of occupancy of an existing buildingCheck the state rule; Part F clause 1.2 brings in alterations of 1,000 square metres or moreNew work may be judged against the current code

State law wins over vintage. Always read the state Act, rules and bye-laws first, then the national code edition they point to.

What should designers, auditors and owners do now?

  • Record the sanction date and the code edition named in the approval for every building you work on. It decides which column of the table above applies.
  • For new projects, design to the state's adopted code but check Part F early. Where Part F is stricter, for example 2 hour enclosure of utility rooms or 30 minute sleeping corridor doors, meeting it now avoids rework if the state adopts it during construction.
  • For audits of buildings between 15 m and 24 m, do not drop high-rise checks on the strength of Part F alone. Confirm the state's own threshold.
  • For EV charging, battery storage and data rooms, read Part F even where NBC 2016 still governs. NBC 2016 has little on these risks, and Part F is the current national guidance.
  • Get your own licensed copy of each code from the Bureau of Indian Standards. Do not rely on copies passed around online, which may be outdated or unlicensed.

How does Fire Code Expert handle the two editions?

Fire Code Expert keeps NBC 2016 Part 4 and NBCS 2026 Part F side by side and picks the edition by the building's age: approved 2026 or later uses NBCS 2026, approved before 2026 uses NBC 2016. For Maharashtra and Delhi it answers from the state fire law first. Each answer cites the clause, and where the code does not cover a point, it says so instead of guessing.

The free public answers on siyahabitats.com/fire-code-expert/ cover state fire law; the full app with both national editions and the Indian Standards needs a sign-in. Like the comparison above, its answers paraphrase and cite clause numbers rather than reproducing BIS text.

Sources

  • SP 7 : 2026 National Building Construction Standards, Part F Fire and Life Safety, clause 1.2: Applicability by occupancy, height and floor area, alterations and self-certification. Clause number and title from the Siya Habitats rule store; values from our clause-referenced digest of Part F.
  • SP 7 : 2026 National Building Construction Standards, Part F Fire and Life Safety, clause 2.39: High Rise Building definition.
  • SP 7 : 2026 National Building Construction Standards, Part F Fire and Life Safety, clauses 3.1 and 3.1.11: Occupancy classification and Group K mixed use.
  • SP 7 : 2026 National Building Construction Standards, Part F Fire and Life Safety, clauses 4.3, 4.4, 4.5 and 4.6; Tables 2, 4, 5 and 6: Occupant load, travel distance, pressurisation, compartmentation and smoke control.
  • SP 7 : 2026 National Building Construction Standards, Part F Fire and Life Safety, clause 5.1; Tables 7A to 7J, 7K, 7M and 9 to 11: Protection levels and detection and suppression matrices.
  • SP 7 : 2026 National Building Construction Standards, Part F Fire and Life Safety, Annexes D (D-7), F, G and M: High-rise and audit method, data centres, car parking and EV, performance-based design.
  • National Building Code of India 2016, Part 4 Fire and Life Safety, clauses 1.2 and 2.38: Applicability and High Rise Building definition. Clause number and title from the Siya Habitats rule store; values from our clause-referenced digest of Part 4.
  • National Building Code of India 2016, Part 4 Fire and Life Safety, clauses 3.1, 3.1.11, 4.3, 4.4, 4.5 and 4.6; Tables 3, 5, 6 and 7: Occupancy, mixed occupancy, occupant load, travel distance, pressurisation, compartmentation and the master installation table.
  • National Building Code of India 2016, Part 4 Fire and Life Safety, Annexes E (E-7) and H: High-rise provisions, fire and life safety audit, car parking.
  • Delhi Fire Service Act 2007 (Delhi Act 2 of 2009), Delhi Fire Service Rules 2010 as amended by the Delhi Fire Service (Amendment) Rules 2025; rule 27 and rule 33; Delhi Gazette Extraordinary Part IV, No. 143, 26 May 2026: Delhi occupancy thresholds and the reference to the National Building Code of India.
  • Bureau of Indian Standards Act 2016, sections 10(5) and 11: Copyright in Indian Standards vests in BIS; reproduction without authorisation is barred.

This guide explains the rules in plain words, with each one cited to its gazette or code clause. Siya Habitats delivers NOC-worthy drawings and a NOC-worthy solution: talk to us about your building.

FAQ

Questions people ask

Is NBCS 2026 mandatory?

Not on its own. The title page and foreword of SP 7 : 2026 Part F describe it as voluntary guidance for state governments and local authorities. It becomes binding when a state or local authority adopts it through its own law or bye-laws.

What is the high-rise height in NBCS 2026?

Clause 2.39 of NBCS 2026 Part F treats a building of 24 m or more as high-rise. Under clause 2.38 of NBC 2016 Part 4 the threshold was 15 m. State fire rules may still use their own thresholds.

Has my state adopted NBCS 2026?

Our research up to September 2026 found no state that had formally adopted it, and Delhi and Maharashtra material still refers to the 2016 code. Check your state's latest bye-law or fire rule notification before relying on either edition.

Which code applies to a building approved in 2018?

NBC 2016 Part 4 as adopted by the state, because a building is generally judged against the code in force when it was sanctioned. New work, alterations or a change of occupancy may bring in the current code.

Did travel distances change in NBCS 2026?

Yes. NBC 2016 Table 5 allowed a 50 percent increase for fully sprinklered buildings, while NBCS 2026 Table 4 gives a separate sprinklered column, for example 60 m for residential and business occupancies in Type 1 and 2 construction.

What happened to Table 7 of NBC 2016?

NBCS 2026 splits it into Tables 7A to 7J by occupancy. Instead of listing each system, these tables assign hose levels HL-1 to HL-6 (Table 7M) or combined sprinkler and hose levels CL-1 to CL-8 (Table 7K), which fix flows, pumps and duration.

Is the fire audit still every two years?

Yes in both editions. NBC 2016 Annex E-7 required a third party audit every 2 years for buildings above 15 m. NBCS 2026 Annex D-7 sets a 2 year audit for high-rise buildings, preferably by a third party, with a defined audit method and compliance rating.

Can I copy clause text from NBC or NBCS into my report?

Be careful. Both codes are copyright of the Bureau of Indian Standards under sections 10(5) and 11 of the BIS Act 2016. Cite the clause number and describe the requirement in your own words.