Siya Habitats / Fire NOC drawing check

Drawing Checker

From a submitted drawing set to cited findings and an indicative fire layer, starting from the architect's own PDF.

In trial
StatusWorks end to end on one architectural set; not yet run across a range of drawings. The output is an indicative layout for a licensed consultant, not a submission.
Drawing Checker
2 minEnd to end, six A2 sheets
89Rooms recovered
24Rules checked, each cited
0Inputs typed by hand
Four stages

Intake, read, check, draft

Measured on one real six-sheet A2 architectural set that we did not draw.

Intake a real six-sheet set; read occupancy, height and storeys, 89 rooms recovered; check 24 rules each citing its clause; draft an indicative fire layer. 2 minutes end to end.
What happens to a set

The sheets tell it what the building is

The binding requirement depends on occupancy and height. Reading them off the sheets is the first step, and the one people get wrong: the height comes from the level the sheets caption as the terrace, not the highest number on the drawing.

  1. 1

    Read the sheets

    Occupancy, height and storeys deduced with no input; rooms recovered from the plans.

  2. 2

    Find the binding rules

    From the state schedule and the national code, for this occupancy and height.

  3. 3

    Check, with citations

    Each requirement checked and cited. "Not determinable" is an outcome when the drawing cannot settle it.

  4. 4

    Draft the fire layer

    An indicative layout merged onto the architect's own sheets.

What comes out

Three files, nothing redrawn

The architect's PDF

Kept byte for byte, with the fire layer merged on top.

A down-comer schematic

A schematic sheet for the riser and down-comer.

An editable DXF

On its own layers, opening with no audit errors.

An indicative layout for a licensed consultant. Not a submission.

Send us a drawing set.

We will run it and walk you through what it finds.

FAQ

Questions people ask

What does the Drawing Checker do?

It takes a submitted drawing set as PDF, DWG or DXF, reads what the sheets say about the building, works out what the building needs for its fire NOC, checks the drawing against those requirements with each rule cited, and drafts an indicative fire layer.

Do I have to enter the occupancy and height?

No. It deduces occupancy, height and storeys from the drawing itself, for example from the room labels and the level captions on the sheets.

How long does a check take?

On one real six-sheet architectural set, the full check took 2 minutes 0 seconds end to end.

Is the output a fire NOC submission?

No. The output is an indicative layout for a licensed consultant, not a submission. It keeps the architect's PDF unchanged with the fire layer merged on top, adds a down-comer schematic sheet, and provides an editable DXF.

What is the status of the Drawing Checker?

It works end to end on one architectural set and has not yet been run across a range of drawings.